Latest Updates

News & Events

Planned maintenance works in Ashanti East Region on 26th October,2025

ECG prepares its System Operators and Controllers ahead of December polls

The Electricity Company of Ghana (ECG) has commenced the preparation of its Control Engineers and System Operators to be fully equipped to handle all emergencies during and beyond the December polls.

ECG disconnects small-scale mining firm from national grid for illegal connection

A surprise check on a small-scale mining firm at Kwapra in Ashanti Region has exposed the company as one of the many making Electricity Company of Ghana (ECG) lose revenue through illegal connection.

ECG cautions public against sale of fake meters

The Electricity Company of Ghana (ECG), has cautioned customers and the general public against the illegal sale, distribution, and purchase of fake meters in the Ashanti Region by some individuals.

ECG Ashanti West Region commissions 15 transformer injections to improve power supply

The Electricity Company of Ghana has commissioned fifteen (15) transformer injections in the Ashanti West Region as part of efforts to improve power supply to its cherished customers in the region.

ECG uncovers 40 illegalities during revenue mobilization drive

The Electricity Company of Ghana (ECG), Ashanti Region, has uncovered the activities of 40 customers engaged in various forms of illegal connections.

ECG uncovers 40 illegalities during revenue mobilization drive

The Electricity Company of Ghana (ECG), Ashanti Region, has uncovered the activities of 40 customers engaged in various forms of illegal connections.

Power theft in Ashanti region alarming — ECG

The Electricity Company of Ghana (ECG) has described as alarming the rate of power theft in the Ashanti Region.

A/R: ECG disconnects power to Amansie South DCE’s residence

The Ashanti Regional Office of the Electricity Company of Ghana (ECG) as part of its efforts to recover huge public debt has disconnected power supply to the Amansie South District Chief Executive’s official residence at Manso Adubia in the Ashanti Region.

54-year-old man arrested for illegal metre installation; 7 fake metres seized

Police in Abuakwa with support from the Revenue Protection unit of the ECG have arrested a 54 year old man, John Fofie, for installing fake metres for some people at Kunsu in the Ahafo Ano South West district of the Ashanti region.

ECG retrieves almost ¢2.5m from 2 defaulting firms in Kumasi

The Electricity Company of Ghana (ECG) has retrieved close to ¢2.5 million from two private firms in the Ashanti region that defaulted in the payment of electricity bills on Thursday in its ongoing revenue mobilization exercise.

ECG arrests 7 persons for illegal connection at Bekwai

Seven individuals have been arrested in the Bekwai municipality of the Ashanti Region for allegedly stealing power from the Electricity Company of Ghana through illegal connection.

Credit purchase challenges with prepaid meters being fixed – ECG

The Ashanti Strategic Business Unit (SBU) of the Electricity Company of Ghana (ECG) has announced that vending challenges with the prepaid metering systems are being fixed.

Address

Electro-Volta House
P. O. Box 521 
Accra, Ghana

GA-145-7445
Ministries, Accra

Talk to us

+233-302-611-611
+233-302-676-727/47

ecgho@ecggh.com
help@ecggh.com
p
ublicrelations@ecggh.com
Official ECG Logo